VIKING ENERGY WIND FARM
We are supporting the creation of the UK’s largest onshore wind farm by moving construction materials to the site and the connecting station. From Denmark, we have transported 20 trailers of turbine foundations. From Sweden, we have brought in 50 loads of Hitachi electrical components. From Ireland, we’ve carried 400 loads of steel reinforcing. From Grangemouth has come 800 cable reels and, from Aberdeen, 1030 loads of cement and 80 loads of civil engineering materials.
We have supplied two arctic units for hire, six days per week for six months during the construction phase and provided a maintenance service on all light goods vehicles for lease companies on contract at site, as well as providing warehouse and laydown areas.
We arranged (through our parent company, Sea-Cargo AS of Norway) a special sailing of the cargo ship Bore Bay from Denmark to Lerwick to bring six heavy-lift cranes from Denmark.


20
loads of foundations direct from Denmark

400+
loads of steel reinforcing

1000+
loads of cement